Controlled requirement
Identify the drawing revision, datum references, functional dimensions and geometric tolerances, surface finish or treatment, and any applicable customer standard.
QUALITY & METROLOGY / DRAWING-LED VERIFICATION
Inspection starts with the approved drawing, critical-to-function features and an agreed measurement method. The required records, sampling level and material documentation are identified during quotation rather than assumed for every part.

ENGINEERING SCOPE
Inspection method, sampling and requested records are reviewed against the controlled drawing revision during quotation and agreed before production.
DRAWING-LED REVIEW
Identify the drawing revision, datum references, functional dimensions and geometric tolerances, surface finish or treatment, and any applicable customer standard.
Agree the measurement method, sampling plan and acceptance criteria, and specify any required CMM data or first-article results; confirm availability and report format.
Request material certificates, certificate of conformity or dimensional reports by name; engineering confirms scope and any effect on timing or price.
FROM COMPONENT REQUIREMENTS
Drawing requirements define what needs verification; inspection records establish the result.