FACILITIES / SHENZHEN
Precision starts here.
Our office and production operations are now in Shenzhen, and the equipment has been retained. Explore our manufacturing approach and historical records; the photographs below document the former Dongguan site.

FACTORY ARCHIVE / FOUR PERSPECTIVES
Explore our
manufacturing history.
Select an area.

Multi-face geometry · angled features
Five-axis machining brings features on different faces into the process assessment. The part geometry determines the setup.
Drawing reviewFeature access, workholding and datum relationships are reviewed against the drawing.
Explore equipmentFROM DRAWING TO DELIVERY
From your drawing
to delivery.
The drawing sets the requirements. Your quotation confirms the process, inspection and delivery details.
- 01Review
Start with the drawing.
Material, quantity, critical features and timing give engineering the basis for assessment.
- 02Machine
Choose the process.
Match part geometry to the machining route and discuss features that need special attention.
- 03Inspect
Define the checks.
Agree the dimensions, sampling and inspection records required for the project.
- 04Deliver
Confirm the handover.
Confirm packaging, documentation and delivery requirements during quotation.

FROM MEASUREMENT TO RECORD
Inspection starts
with your drawing.
Tell us which dimensions, surfaces and material requirements matter to your part. We confirm the inspection method and required records during quotation.
- Dimensions
- Discuss dimensional results, CMM data and first-article records.
- Materials
- Specify material certificates or a certificate of conformity with your RFQ.
- Acceptance
- Agree the drawing revision, sampling level and report format during quotation.

AN ENGINEERING REVIEW, IN PRACTICE
What we review
before machining.
An extract from a socket-body DFM assessment: the details raised for confirmation before production.
Thin walls & intersecting holes
Review the remaining wall at hole intersections and the risk of local deformation.
Machining & appearance
Consider the transition between two machining setups, visible cutter marks and chamfers for burr removal.
Agree the acceptance criteria
Define appearance zones and burr inspection methods. Where passivation and salt-spray testing are specified, confirm the applicable requirements, test method, duration, acceptance criteria and responsible provider.
FOR YOUR SUPPLIER REVIEW
Review the
factory records.
The 2025 equipment register and certificate copies below relate to the former Dongguan site. Contact our Shenzhen team for current site information and applicable supplier qualification documents.
Equipment & metrology
2025 registers · stated quantities, makers and models · one-factory scope
Certificate copies
View the original documents and their stated expiry dates.
Certificate copies
View the original documents and their stated expiry dates.
These copies concern the named historical entity and site; they do not establish certification of the Shenzhen site. Check the entity, scope and current standing before supplier approval.
Your qualification requirements
Discuss site visits, required documents and questions specific to your part.